CHEMICAL · MINING & METALS · PULP & PAPER · CEMENT · REFINING
Heavy Industry & Process
Continuous process cannot be paused to be secured. A process upset is a safety event and a regulatory filing, and the windows that would allow change are few.
Where it shows up
An OPC gateway exposes tags that were never meant to leave the cell.
A safety instrumented system shares a switch with building automation.
A vendor's remote session reaches the reactor control loop from the office.
What changes
Process consequence
Ranked by unit, batch and safety interlock, not by CVE score.
Work inside the shutdown
Actions scoped to the next planned stop, not the next quarter.
One map across units
Every DCS node, gateway and safety loop in one exposure model.